The Universitat Politècnica de València has photovoltaic energy production facilities for self-consumption in its three campuses. The basic data of each of the plants in operation are shown below.
Vera Campus
In July 2024, the installation of a 974.87kWp photovoltaic system, financed with a grant from the European Union’s NextGenerationEU program, became operational. This installation is in addition to an existing 11.8 kWp installation on the 7G building. The performance of the whole system can be analyzed in the attached graph.
More information:
- First PV plant at Vera campus, at full capacity (July 2024)
- 1,475 photovoltaic panels installed on the roofs of 12 buildings on the Vera campus (February 2024)
- Tender for a 910 kW (972.4 kWp) solar photovoltaic installation for self-consumption (April 2023)
- Grants for the installation of photovoltaic systems on the Vera campus (September 2022)
Gandia Campus
Solar energy production at the Gandia campus